Retrofit Your Cooling Tower to the Existing Basin

Save New Basin's Construction's Costs and Minimize Production's Down Time!

Send

Contact Us

 

The Retrofit Advantage

YWCT specializes in adjusting field erected cooling towers made of FRP to the existing concrete basin, thereby providing its customers with various advantages‭:‬

  • Minimizing production downtime
  • On-site erection of new tower parallel to existing cooling towers' operation
  • Increasing cooling capacity using the available footprint
  • Optimizing new cooling tower's anergy consumption
  • Adjusting fill type to current water quality parameters‭
  • The newly retrofitted FRP towers will have a life-cycle of more than 25 yers

Donetsk Steel Metalworks‭ | ‬The Ukraine 2013

Field Erected Cooling Tower Made of FRP‭ ‬Retrofitted to an Existing Basin

Determined to Cool

Contact Us
Fix the following errors:
Hide